Powered By Kitlog Pro v2.0
Marks Web Site
RV-7A
Fuselage
12-14-2007
< Previous Log Entry
Next Log Entry >
Date:
12-14-2007
Number of Hours:
3.00
Manual Reference:
8-9
Brief Description:
Cabin and baggage are floor and side panel instal
Today I installed the cabin and baggage area floors.I also worked on the baggage area side panels where I installed anchor nuts to allow for removal of the panels if desired.
Cabin and baggage area floor installation
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
606
2383
Empennage
59
221
Engine
2
7
Firewall Forward
71
326
Fuselage
260
1134
Instrument Panel
25
102
Miscellaneous
46
158
Shop Supplies
1
2
Wings
142
433
Copyright © 2001-2024 Matronics. All Rights Reserved.